Caltrain Bridge Rehabilitation  Projects     
Caltrain

Bridge Rehabilitation Projects - Replacement of Quint and Jerrold Bridges

Project Lead:
Caltrain

Contractors:
To be determined by competitive bid

Project Limits:
Project will occur at two bridge sites:

  • Quint Street
  • Jerrold Street

Construction Cost:
$18 million (estimate)

Begin Construction:
January 2009

End Construction:
January 2010

Reason for Project:
This project is necessary to replace steel span bridges, which have deteriorated with time and regular use.

Scope of Work:
Each bridge has specific requirements, however, a general review of the scope of work that will be done during this project includes:

  • Removing and replacing existing steel through-girders
  • Installing drainage systems for the deck
  • Reconstructing streets and pedestrian sidewalks