Construction Cost:
$1.6 Million
Begin Construction:
June 2007
End Construction:
December 2008
Reason for Project:
The bridge decks have exceeded their useful lives
and need to be re-decked in order to remain viable.
Scope of Work:
Bridges will be replaced at Alma Street, San Francisquito
Creek, Matadero Creek and several drainage channels.
Where applicable, bridge decks will be replaced with
reinforced concrete pipe and covered with fill and ballast
as a foundation for tracks. This will allow water to pass
through without the maintenance requirements of a
traditional bridge. At San Francisquito Creek, the deck
will be repaired and timber beams will be replaced. At
the Alma Street overpass, knee braces will be replaced.
|